The Shanghai Hong Kou Stadium contains an honorable history
for 46 years and also was the first stadium holding the international
competition in China. It was rebuilt and completed on February
22, 1999 and became the first standard and professional football
stadium in China It is used as the host stadium of Shanghai
Shenhua FC since then. In 1991, the First Marlboro Shanghai
International Football Tournament was held in the Hong Kou
Stadium while this year the Shanghai International Football
Tournament will be back to this homeland after a long time
apart.
Arena
With a land area of 56,000 square meters and a total floor
area of 72,000 square meters, Hong Kou Football Stadium has
the main function of holding high level domestic and international
football matches as well as different shows and concerts.
What's more? The stadium also provides entertainment and
fitness facilities to meet public needs and to promote nationwide-building
activities. So the stadium can be valued as a complex of
athletics sports, shows and concerts, public leisure, fitness
and entertainment activities.
The stadium provides a 70 meter by 105 meter FIFA standard
natural grass football pitch. The grass system was imported
from the US with heating and circularly irrigation to ensure
the watering in dry environment and heating in cold weather
all year long.
Stands
Totally there are 22 stands with maximum 35,000 seats, among
them there are also some specialized seats for disabled people.
Thanks to the double layered roof of the stadium, the audience
can be entertained in a comfortable environment, whether
the conditions are cold, rainy or sunny. 834 seats are set
at the VIP Section with special seats for VIP guests. In
front of the VIP Section, 32 senior journalist seats are
set with telephone, television and USB interfaces to ensure
the rapid and accurate transfer of information.
Between layer one and layer two of the stands, you will
see 47 VIP boxes of 70 or 45 meters squared per room. There
is a reception hall of more than 300 square maters at the
west entrance and 2 VIP rest rooms of about 180 square meters,
decorated in Chinese and western styles as well as one 180
square VVIP box.
Facility
The stadium provides domestic and overseas synchronous broadcast
facilities and eight camera positions, as well as parking
space for the broadcast van. Moreover, there are also broadcast
facilities with fax machine and domestic direct-dial phones
for journalists, match commissioners and referee coordinators.
There are 4 player locker rooms of 128 square meters with
shower facilities. Besides that, there are another 2 rooms
with the same facilities for referees and one 180 square
meter room for general coordinators, one 350 square meter
examining hall with a medic and drug testing room conjoined
with a 300 square meter indoor training room with modern
facilities.
The energy center consists of energy collocation, management
and transfer with 2 steam boilers imported from the UK as
well as 3 central air conditioners imported from the US.
All are computer controlled to insure effective monitoring.
Underneath the east stand, there is a three layered garage
with 253 parking spaces and an outside parking lot with a
500 vehicle capacity.
|